First, we must identify:
- 1- Preliminary scope and onsite activities.
- 2- key personnel
- 3- onsite logistics
- 4- Timing of the Energy Assessment.
· What are the Preliminary scope and onsite activities?
The preliminary scope is to
provide the site with a trained staff that can effectively apply energy
management principles to investigate systems in the data center.
· Who are the key personnel?
The person who apply energy management assessment results and
provides support in technical terms.
· What is onsite logistics?
Arrange a gate pass for the evaluator and identify lodging issues
- when is the assessment can be done?
the total number of days on-site depends on the number of system examinations (typically 2-3 days per Primary System)
The Site Lead (key personnel) should do a preliminary assessment, based on available data. The evaluator will be available (off-site) to assist. Besides providing an energy profile of the data center, this preliminary assessment will help with the Target Systems identification.
The Site Lead (key personnel) should do a preliminary assessment, based on available data. The evaluator will be available (off-site) to assist. Besides providing an energy profile of the data center, this preliminary assessment will help with the Target Systems identification.